Latest pics at Yalwal for its shakedown
Huge thanks to Wooders for a great job..
Sent from my iPhone using Tapatalk
DIESELCON - DC Mk 2 - 2015 WK2 CRD 33" ATR's on 17" sevens, 2" lift & 2000 TJ on 35's beadlocks
Another shake down on Saturday and I think Venom is ready for longer trips and harder tracks.. finally got under it today and found 3 bolts that needed retorqing up.. a few pics from the weekend..
this pic still had 1 compression in the rear and a little more in the front.. not bad for swaybars connected
The front driver was all the way up, but had some more travel on the passenger side. This was a confirmation that the front ARB bar didnt require any chopping [emoji106]
Sent from my iPhone using Tapatalk
DIESELCON - DC Mk 2 - 2015 WK2 CRD 33" ATR's on 17" sevens, 2" lift & 2000 TJ on 35's beadlocks
So the TJ was built Wheeled, Broken, Fixed, wheeled and rebuilt to Woodley specs Re engineered for NSW and daily driven for 6 months and wheeled Hard just about every weekend........
and then Sold.
its new Home is Byron Bay and the owner has an LSX motor and tranny to replace the 4.0L engine... lets hope those Dana44s can handle that power...
Before it Left the Jeepersville stable a photo shoot and trip with Jeep Action Magazine took place... hope you enjoy the story n pics .
Sent from my iPhone using Tapatalk
DIESELCON - DC Mk 2 - 2015 WK2 CRD 33" ATR's on 17" sevens, 2" lift & 2000 TJ on 35's beadlocks
Bookmarks